Huasheng
Bridge EngineeringTransportation

South America Harbor Bridge

Rio de Janeiro, Brazil|Completed (2025)

A 3.2km cable-stayed bridge with a 720m main span connecting Rio de Janeiro to Niterói, Brazil — one of the world's longest cable-stayed bridges.

A 3.2km cable-stayed bridge with a 720m main span connecting Rio de Janeiro to Niterói, Brazil — one of the world's longest cable-stayed bridges. This project stands as a landmark achievement for Huasheng in the field of Bridge Engineering, Transportation. Our project team leveraged world-class engineering technologies and project management methods, applying scientific construction organization, rigorous quality and safety controls, and advanced digital management to achieve optimal performance across safety, quality, schedule, and cost.

South America Harbor Bridge

Throughout implementation, Huasheng upheld our core value of Safety First and Quality Excellence. Through scientific planning, meticulous control, and team collaboration, we ensured efficient progress and successful delivery, creating significant economic and social value for our clients.

South America Harbor Bridge 1
South America Harbor Bridge 2
South America Harbor Bridge 3
Bridge EngineeringTransportation